Course Outline
Overview of the Commissioning Process
- ASHRAE Guideline 0-2013 and Standard 202-2013
- What is the commissioning process?
- What is a quality delivery process?
- ASHRAE/NIBS Guideline 0-2013
- What occurs in each phase of project delivery?
- Benefits of the commissioning process
Building Science Fundamentals
- The 2nd Law in layman’s terms
- Rain control
- Psychrometrics
- Water vapor transport
- Moisture control
- Interstitial condensation
- Confusion about diffusion
- Moisture and materials and sustainability
- Air transport
- Airflow control
- Pressures and IAQ
- Interaction with mechanical equipment
- Heat transfer
- Heat transfer control
- Thermal bridging
- ASHRAE Standard 160
- Moisture control design analysis
- Integrated design for the control of heat, air, and moisture
- Avoiding mistakes
- Learning from past successes and failures
The Building Enclosure Commissioning Process
- Commissioning process roles and responsibilities
- Pre-design phase commissioning activities
- The OPR and BOD
- The BECx plan
- Design and submittal reviews
- Construction phase verification
- The BECx test plan
- Systems manual requirements
- Owner training
- Lifetime persistence plan
- Close out report
- Overview of NIBS Guideline 3-2012
- Overview of LEED v4 EA Envelope Commissioning
- Overview of ASTM E2813
- Benefits and impact of BECx for stakeholders
- Staffing requirements and cost guidelines
Architectural Details and Interfaces
- Water barriers
- Air barriers and the importance of continuity
- Vapor barriers
- Impact of climate and geography
- Transition and interface details
- Walls and facades
- Flashings
- Windows and doors
- Curtain walls
- Roofs
- Slab on grade, foundations, and basement walls
- Sustainable assemblies/high performance details
- Coordination with other building systems and assemblies
- Enclosure penetrations
Building Enclosure Commissioning Tests
- The BECx test plan
- Test standards and guidelines
- Qualitative and quantitative tests
- Verification means and methods
- Performance criteria
- Laboratory tests
- Component, assembly, and whole building tests
- Water tests
- Air tests
- Mockups
- Testing roofs, flashing, and roof penetrations
- Testing walls, windows, and doors
- Testing penetrations
- Infra-red and whole building testing after construction
BECx Case Study
- Building description
- CxP plan and activities
- Construction sequence
- Construction checklists for BECx
- Mock-ups and constructability review
- Schedule
- Building performance and whole building testing
- Summary of scope of work and the close out report
- Examples of completed checklists and test results