Course Outline
Online course agenda:
Download the full online agenda in pdf format here
Classroom (in person) course agenda:
Download the full in-person agenda in pdf format here
Topics
Introduction and Course Orientation
Overview of the Commissioning Process (CxP)
- What is the ASHRAE Guideline 0 commissioning process?
- Current best practice
- What is a quality delivery process?
- Benefits of the commissioning process
- What occurs in each phase of project delivery?
Pre-Design Phase Commissioning Tasks (Part 1)
Developing the owner’s project requirements (OPR)
- Owner’s workshop: preparation and participants, nominal group technique, procedures and results
The Owner’s Project Requirements Workshop
- Executing an OPR workshop
- Determining which questions to ask – project success criteria
- Class activity: OPR workshop in action
Pre-Design Phase Commissioning Tasks (Part 2)
- Planning the CxP effort
- Commissioning plan fundamentals, key milestones, structure
- Evaluating the benefits of pre-design phase involvement
- The CxP as a strategic quality plan
Class Workshop: Defining CxP Needs
Developing the OPR Document
- Review of key OPR concepts
- Typical information required to develop needs
- Steps in document creation
- Group Activity: discussion of example document
CxP Activities in the Design Phase
- Pre-design meetings
- Design checklists
- Basis of design development
- CxP design review process
- CxPlan update
Design Review Workshop
- Group workshop using the four steps of a CxP design review procedure
Commissioning Specifications
- Format options
- Types of requirements: contractor participation; maintainability; checklist implementation; shop drawings, training, and systems manual; testing and verification
- Group specifications activity
Commissioning Process Checklists
- Purpose, goals
- Use in all project phases
- Construction checklists: development, tracking methods, verification, statistical sampling
- Checklist work session
Systems Manual and Training
- Systems manual (role in all phases)
- Training (role in all phases)
Construction Phase CxP Tasks
- Pre-construction activities (pre-bid, workshops, partnering)
- Cx meetings and coordination, role of the CxA
- Tracking commissioning activities
- Cx schedule
- Testing
- Commissioning reports
- Benefits/issues log
Commissioning Process Tests
- Developing test protocols
- Confirmation of readiness
- Implementation steps
- Documentation
- Group workshop
Integrating CxP with Contractor Efforts
- Quality processes
- Overlaps and gaps
Acceptance Phase, First Year of Operation, and Beyond
- Training
- Systems manual
- Project CxP report(s)
- Warranty review and seasonal testing
- On-going commissioning
Electronic and Web-Based Commissioning Tools
- Computer tools for site tracking
- Electronic systems manuals
Analyzing the Benefits of Commissioning: Case Studies
- Scope of commissioning
- Detailed cost analysis
- Benefits and lessons learned
Special Topics in the CxP
- Review of LEED Cx process
- Review of existing building Cx process